PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Door frames delivery for the 1st floor Facing West (800x600).jpg Installing split wire above the cealing at the 2nd floor Facing West (800x600).jpg Main Sprinkler piping at the 1st Floor Facing North-East (800x600).jpg Metal Track (800x600).jpg Poured slab on deck at half of the 4th Floor Facing North-West (800x600).jpg Pouring concrete at half of the 4th Floor Facing North-West (800x600).jpg Welding beam clips at the 3rd Floor Facing East (800x600).jpg
Previous pageNext page Poured slab on deck at half of the 4th Floor Facing North-West (800x600)
Poured slab on deck at half of the 4th Floor Facing North-West (800x600)